The Energy Park Fife – UK

The Energy Park Fife Decommissioning Facility is one of the UK’s most advanced decommissioning facilities.

The facilities substantial hard standing dismantlement and processing area has a purpose-built membrane layer incorporated into the concrete slab, with a full water collection and treatment system to ensure that all fluids are collected and treated on-site, ensuring zero emissions to sea or ground.

All fluids collected are collected, sampled, separated and treated prior to being safely discharged back to sea. As only small volumes of contaminated fluids require transportation from site for disposal at certified waste receivers, significant cost savings are on passed to our clients and our carbon footprint is reduced substantially by reducing road traffic to and from the facility for the disposal of fluids.

With access to 345 metres of quayside, water depth between 4.9m and 10m (mean), and up to 30,000m2 of hard standing laydown area, The Energy Park Fife Decommissioning Facility can accommodate multiple substantial projects in parallel.

Address:
CessCon Decom Ltd.
Energy Park Fife Decommissioning Facility
Wellesley Road
Buckhaven
Fife KY8 3RA


  • Energy Park Fife Decommissioning Facility

    Capacity / Size

    100,000 tonnes capacity / Area of over 300,000 m2

    Quay 1 / East

    180m long quayside with up to 4.9m mean water depth for barge offloading of infrastructure

    Quay 2 / West

    165m long quayside with up to 10m mean water depth for barge and HLV offloading of infrastructure

    Water Treatment

    Fluid collection and Separation System

    Surface

    Concrete; with membrane and drainage systems to water treatment plant

    Site Facilities

    NORM treatment and storage area, WEEE storage area, Asbestos handling & storage area, water treatment plant

    Welfare Facilities

    Site offices, canteen facilities, locker-rooms, car park


  • Site Overview

     


    Gallery